Commercial EV fleet charging for Bath (BA1, BA2) — multi-charger installs for hotels, taxi/courier bases, council fleets and workplaces. Load-balanced 22 kW AC, three-phase. OZEV Workplace Charging Scheme covers up to £350 per socket (max 40 sockets). Type A RCBO mandate. DNO notification handled. BS 7671 18th edition, NAPIT 66245 registered. From £980 + VAT @ 20%.
Or WhatsApp: wa.me/447889334849
NAPIT
CHAS
City & GuildsCommercial EV fleet charging for Bath (BA1, BA2) — multi-charger installs for hotels, taxi/courier bases, council fleets and workplaces. Load-balanced 22 kW AC, three-phase. OZEV Workplace Charging Scheme covers up to £350 per socket (max 40 sockets). Type A RCBO mandate. DNO notification handled. BS 7671 18th edition, NAPIT 66245 registered. From £980 + VAT @ 20%.
Full service detail on our parent Commercial EV Fleet Charging page.
Bath (BA1, BA2) is a UNESCO World Heritage city — commercial EV charging here is heavily focused on hotel guest bays and council depot fleets. Hotels in central Bath (BA1) typically already have three-phase supply but rarely the headroom for 4× 22 kW chargers, so a load-balanced sub-board is the standard answer.
Bath has a strong tourism / hospitality EV market — guests increasingly choose hotels with destination 22 kW AC charging. Bath hotel installs we deliver typically sit in the £9-15k bracket before OZEV £350/socket reclaim (max 40 sockets, £14,000 cap).
Listed Grade I/II buildings in central Bath: surface-mounted galvanised conduit on stone walls (no chases), back-of-house cable routes through service yards, and full conservation officer briefing before install.
Sister city pages: Domestic EV Chargers in Bath · Commercial Electrical in Bath
Final price depends on access, supply, existing wiring and scope. Survey is free; written quote is fixed. Read the disclaimer below the cards before assuming.
Yes. Bath hotels (BA1, BA2) typically already have a three-phase supply but rarely the headroom for 4× 22 kW chargers. We do the max-demand calc against the existing meter, file a G99 notification with the DNO (Western Power / National Grid Distribution) where needed, and design a load-balanced sub-board so the existing kitchen, lift and AC loads are protected. Most Bath hotel installs land in the £9-15k bracket before the OZEV reclaim.
Yes — the OZEV Workplace Charging Scheme covers £350 per socket up to a maximum of 40 sockets (so £14,000 max per applicant). You must apply BEFORE we install — we'll handle the WCS voucher application and submit the post-install evidence pack on your behalf. The scheme is for businesses, charities and public-sector bodies with off-street parking.
BS 7671 Amendment 2 and the IET EV charging Code of Practice both require Type A (or Type B) RCD protection for every EV charger. Type AC RCDs cannot detect the DC residual currents that EV charging produces — under fault, they can blind and fail to trip. Every install we do gets a Type A RCBO per socket as standard. We'll never fit a Type AC on an EV circuit.
Free survey, fixed-price written quote, full BS 7671 certification. Call Dan directly on 07889 334849.
07889 334849Same commercial ev fleet charging service across our other Somerset coverage areas.