07889 334849☰Get a quote
Hypervolt home EV charger installed on a rendered wall by DS Electrical Installations (SW) Ltd
★★★★★5.0 on Google from 28 reviews

EV charging

Charge at home, every night.

Hypervolt chargers — installed, load-balanced and certified to BS 7671. DNO notified, app set up before we leave.

Accredited & insured
NAPIT approvedNAPIT
CHAS accreditedCHAS
City & Guilds qualifiedCity & Guilds
Part P registeredPart P
BS 7671 18th Edition compliantBS 7671

Try it yourself

Check your home before you book.

Continuity test reading on a Megger multifunction tester

Home & workplace charging

The right charger, installed right.

We fit Hypervolt chargers, matched to your car and your supply, and install them neatly with tidy cable runs and full protection.

  • 7kW home charge points
  • Hypervolt chargers, app set up before we leave
  • Type A RCBO protection built in
  • Load balancing to your supply
  • App set-up & handover
  • Workplace & multi-unit charging

What’s included

A complete, certified install.

Hypervolt home EV charger fitted to a stone wall with the cable coiled below
01

On the wall and working

Hypervolt charger supplied and fitted where it is easy to plug in every day.

Two red rotary isolators on an outside wall
02

Safe

Its own Type A RCBO, the right earthing and an isolator as standard.

Megger tester connected to an industrial socket for testing
03

Tidy

Cable runs clipped or in containment, routed neatly. No eyesores.

Martindale multifunction tester showing a 0.48 ohm loop impedance reading
04

Certificated

BS 7671 certificate, DNO and Building Control handled for you.

Hypervolt charger being tested at commissioning by DS Electrical Installations (SW) Ltd

Neat where it matters

Charging that suits the house.

We route cables discreetly and mount the unit where it works for you — a clean finish on brick, render or stone.

See EV installs →

Pricing

How we price EV chargers.

Every installation is priced individually. The price depends on the cable run and the consumer unit, and the written quote sets out exactly what is included, charger and all. DNO notification, app set-up and handover are part of every install.

Get a quote

FAQ

EV charging questions.

Which charger should I get?

We fit Hypervolt chargers, set up to suit your car, your driveway and your supply. They are reliable, app-controlled with off-peak scheduling, and all fitted on Type A RCBO protection.

Do I need my supply upgraded?

Usually not — we load-balance the charger to your existing supply. If anything’s needed we’ll tell you up front.

How much does a home EV charger cost to install?

It depends on the length of the cable run and whether the consumer unit needs any work. We give you a fixed written quote that sets out exactly what is included, charger and all: the dedicated circuit, cabling, fitting and NAPIT certification.

Why do you only fit Hypervolt?

Because they are reliable, they are controlled from an app with off-peak scheduling, and Hypervolt's support team is UK-based. Fitting one brand means we know the unit inside out, so the install goes the same way every time.

Can I keep charging from a 3-pin plug and an extension lead?

We don't recommend it. An EV draws a high current for hours at a time, which ordinary domestic extension leads are not designed for, and in winter the lead is often left out in the wet. A dedicated charger on its own protected circuit is the safe way to charge every night.

Do I need to upgrade my consumer unit for an EV charger?

Not always. The charger needs its own circuit with a Type A RCBO, and some older consumer units have no space or no suitable protection for that. We'll check your board at the survey.

How long does EV charger installation take?

A standard installation takes 3–4 hours. If the cable run is longer or a consumer unit upgrade is needed, it may take a full day.

More from DS Electrical Installations (SW) Ltd

Other services.

All services →

The charger we fit

Hypervolt. One brand, fitted properly.

We fit Hypervolt chargers on every home install. Fitting one brand means we know the unit, the app and the setup inside out, so the install goes the same way every time.

01

Reliable

Quick to commission and dependable once it is on the wall, so you are not waiting on a return visit the morning after.

02

App control & off-peak scheduling

Set the car to charge overnight on your cheaper rate and check or change charging from your phone. We set the app up with you before we leave.

03

UK-based support

If you ever need help with the charger itself, Hypervolt's support team is in the UK.

How it works

What the install involves.

01

Site check

We look at where you park, the cable route and the main fuse. Photos are often enough to quote.

02

Board & earthing check

We check the consumer unit and earthing. Some older boards need upgrading first; we tell you before you commit.

03

Its own circuit

A dedicated circuit from the consumer unit, protected by a Type A RCBO.

04

Install

The Hypervolt charger fitted where it suits you, with tidy clipped cable runs.

05

Test & certificate

Tested to BS 7671, certificate issued, DNO notified and the app set up with you.

What we need from you

Three photos get you a quote.

Send us these and we can usually price the job without a visit:

  • Your consumer unit (fuse board), cover closed is fine
  • Your electricity meter and main fuse
  • Where you park, and where you would like the charger

Not sure the house is ready? The EV-ready checker asks five quick questions about your board and parking, and the 3D planner lets you spec your charger, tethered or untethered, before we visit.

WhatsApp your photos Or use the form

Charging in winter

No more extension leads on the drive.

Cold, dark evenings are when a trailing lead through a window or door is least safe. A wall charger on its own protected circuit stays put in any weather, and off-peak scheduling in the Hypervolt app means the car charges overnight on your cheaper rate without you having to think about it.

Useful reading: EV charger cost guide · installation guide · is my home EV-ready? · renting or in a flat? · consumer unit upgrades (often needed before a charger).

Included as standard

Full installation. No hidden costs.

Every installation includes everything you need for safe, certified home charging from day one.

01

Dedicated 32A radial circuit

New dedicated radial from your consumer unit using 6mm² T&E (internal) or 10mm² SWA (external runs over 15m). Dedicated 32A Type A RCBO protection sized to BS 7671:2018+A4:2026 requirements.

02

Earthing & RCD protection

Full earth fault loop impedance and prospective fault current testing. Every charger circuit has its own Type A RCBO, with 6 mA DC fault detection built into the charger. On PME (TN-C-S) supplies we check the earthing for outdoor charging and fit an earth rod where the design needs one.

03

BS 7671 certification

Full Electrical Installation Certificate (EIC) issued and registered with NAPIT for Building Regulations Part P compliance. Includes schedule of inspections and test results to BS 7671:2018+A4:2026.

04

Smart app configuration

Charger connected to your Wi-Fi network, manufacturer app installed and configured, smart charging schedules set to match your energy tariff. CT clamp fitted where required for dynamic load management.

05

Professional cable management

Neat, clipped SWA cable runs or galvanised trunking with proper glands, saddles and weatherproof terminations. All penetrations sealed and fire-stopped. No exposed cables, no unsightly runs.

06

Full DNO paperwork

We handle the network operator notification or application, and provide all compliance documentation including photographs and installation records.

Charging speeds

Single-phase vs three-phase.

01

Single-phase (230V, most UK homes)

Maximum 7.4kW charging speed. Adds approximately 25–30 miles of range per hour. A typical EV (60kWh battery) charges from 20% to 80% in around 5 hours. More than sufficient for overnight home charging.

02

Three-phase (400V, commercial & some larger homes)

Up to 22kW charging speed. Adds approximately 75–90 miles of range per hour. Ideal for workplaces, fleet depots, hotels and destinations where faster turnaround is needed. Requires a three-phase supply — we can arrange upgrades through your DNO if required.

03

Key consideration

Your charging speed is limited by either the charger output or the vehicle’s onboard charger — whichever is lower. Most EVs accept 7kW AC; some (like Tesla Model 3 and BMW i4) accept 11kW; fewer accept the full 22kW. We advise on the right charger for your specific vehicle.

Both domestic and commercial installations require a site survey to confirm cable routes, supply capacity, main fuse rating and earthing arrangements. We provide surveys across our coverage area.

Technical requirements

Installation engineering.

EV chargers draw sustained high current — typically 32A continuous for hours. A properly designed dedicated circuit is non-negotiable for safety, performance, and compliance with BS 7671:2018+A4:2026 Section 722.

01

32A radial circuit

6mm² twin-and-earth for internal runs up to 22m, or 10mm² SWA cable for longer external runs and underground routes. Cable sizing calculated per BS 7671 Appendix 4, accounting for volt drop (max 5%), grouping factors, thermal insulation and ambient temperature. We never undersize cables.

02

RCD protection & DC fault detection

BS 7671 requires each charging point to have its own 30 mA RCD and protection against DC fault current. The Hypervolt chargers we install have integral 6mA DC fault detection, so a Type A RCBO at the consumer unit is all that’s required. No additional DC module or upgraded device needed.

03

DNO notification

Every charger we fit goes through the network operator's EV process (National Grid Electricity Distribution in our area). Where the property's maximum demand allows, we notify them after installation; where it doesn't, we apply before we fit. Larger chargers, or more than one, may need a supply capacity assessment and in some cases a main fuse upgrade. We handle all DNO correspondence and applications.

04

Supply capacity assessment

We measure your existing demand and verify your main fuse rating (typically 60A, 80A or 100A). A 7kW charger draws 32A — if your existing peak demand is 40A on a 60A supply, there is a problem. We model your load profile and recommend solutions: supply upgrade, smart load management via CT clamp, or scheduled off-peak charging to stay within your capacity.

05

PME earthing considerations

Most UK homes have PME (TN-C-S) earthing. BS 7671 restricts using a PME earth for a charger used outdoors, because of the risk from a broken PEN conductor in the supply, unless an extra protective measure is used. Options include a charger with built-in open-PEN protection or an earth electrode. We assess your earthing at survey and implement the correct solution.

06

Load management

For properties with multiple chargers (or limited supply capacity), we install CT clamp-based dynamic load management. This monitors real-time household demand and throttles the charger output to prevent main fuse overload. For larger installations, we configure OCPP-based load management systems.

Commercial solutions

Workplace & fleet charging.

From a single staff charger to a 40-bay car park, we design and install commercial EV charging infrastructure that scales with your business.

Workplace charging

The shift to electric vehicles is accelerating. Employees expect workplace charging as standard. Offering it makes your business more attractive to talent and demonstrates genuine commitment to sustainability. We design workplace charging systems that work commercially:

  • Load-managed multi-charger arrays — share available capacity across all bays without expensive supply upgrades
  • Back-office billing — RFID authentication and OCPP-compatible chargers allow you to bill employees or offer free charging as a perk
  • Visitor and customer charging — contactless payment options for public-facing sites (hotels, retail, restaurants)
  • Fleet depot charging — scheduled overnight charging for delivery vans, pool cars and company fleets
  • Car park installations — feeder pillars, ground-mounted chargers, bollard protection, and cable management for tarmac and concrete surfaces

Commercial charging management

Commercial installations require more than hardware. We configure charging management platforms that give you full control:

  • OCPP 1.6/2.0 compliance — open protocol compatibility means you are not locked into a single vendor
  • Usage reporting — track kWh consumed per charger, per user, per session; export data for expense management and carbon reporting
  • Revenue generation — set your own pricing per kWh or per session; accept contactless, RFID or app payments
  • Remote monitoring — real-time status of every charger, fault alerts, firmware updates and usage analytics via web dashboard
  • Smart scheduling — prioritise fleet vehicles overnight, allocate capacity to staff during working hours, and open bays to the public at weekends

Fleet depots, workplace car parks, hotels and destination charging sites running multiple OCPP-connected chargers don’t just need power — they need reliable network infrastructure for cloud reporting, dynamic load management and driver authentication. We do both halves in-house: network infrastructure →

Multi-bay fleet rollout? Full scope, DNO consultation, dynamic load management and 6-bay-plus pricing on the dedicated page: Commercial EV fleet →

Areas we cover

EV charging across Mid Somerset.

What customers say

★★★★★
“I had a brilliant experience using Dan for a full revamp of the electrics ready for the new kitchen. It was a large project and he explained things clearly and gave me options.”
Nicola Laing · Google review
★★★★★
“Dan and his team did a fantastic job upgrading everything in my flat. Professional, tidy, and excellent quality work throughout.”
Catherine Wyatt · Google review
★★★★★
“Dan arrived on time, completed the job in a professional and speedy way. There was no mess to clean up. I would highly recommend.”
Verified Client · Checkatrade
Read all reviews →

Get a quote

Get your EV charger fitted.

Tell us your car and where you park — we’ll quote a neat, certified Hypervolt install.

  • ✓ NAPIT registered & CHAS accredited
  • ✓ Fully insured, every job certified
  • ✓ Fixed written quotes
  • ✓ Mid Somerset & surrounding areas

We come back within 24 hours. Prefer to talk? Call DS Electrical Installations (SW) Ltd on 07889 334849 or WhatsApp us a photo of your consumer unit and parking spot.

★★★★★ 5.0 on Google from 28 reviews · NAPIT approved · every job certificated

✓

Thanks — that’s sent.

DS Electrical Installations (SW) Ltd will call you back to talk through the job.

In Bath