Will my house cope with an EV charger and a heat pump?
It depends on your main fuse rating, the big loads you already have and your fuse board. Together they are a lot of extra load, so a 60A main fuse, or one you cannot read, can mean the network operator needs to assess the supply. Use the checker for an indication; we confirm everything at a survey.
How do I find out my main fuse rating?
Look at the sealed cut-out where the supply cable comes in, usually beside the meter. The rating may be marked on it, for example 60A, 80A or 100A. Look only: never open, remove or touch the cut-out or the meter. If you cannot see a number, that is fine, we check it at the survey.
What if my main fuse needs upgrading?
Main fuse upgrades are carried out by the network operator, not by us. National Grid Electricity Distribution, the network operator for Somerset and Bath, takes applications to upgrade older 30 or 60 amp fuses to 80 amps. The meter tails may need upgrading first, which we check at the survey.
What is a looped supply?
In some streets one supply cable is looped from one home to the next, sometimes along several houses. If your supply is looped, the network operator assesses it before extra load like an EV charger or heat pump goes on, and that can mean a new separate supply for your home.
Does the network operator need to know about my EV charger or heat pump?
Yes. EV chargers and heat pumps have to be registered with the network operator. Your installer applies on your behalf through ENA Connect Direct, and where an application is needed the network operator confirms whether the equipment can connect within 10 working days.
Do you install heat pumps?
We do the electrics only: the supply checks, the fuse board and a dedicated circuit for the heat pump. The heat pump itself is fitted by your heat pump installer.
Which EV charger do you fit?
We fit Hypervolt home chargers, each on its own dedicated circuit with a Type A RCBO. Where a new board is needed we fit a FuseBox metal consumer unit with a main switch and a Type A RCBO for every circuit.
Is the result a guarantee?
No. It is an indication from your answers, not a design. We confirm the main fuse, maximum demand, earthing, the board and the cable route at a survey before anything is quoted.