How we approach each job, without naming clients. Three working examples covering commercial network, landlord portfolio EICRs and a Grade II Bath heritage rewire.
These are reference installations carried out by DS Electrical Installations (SW) Ltd across Mid Somerset and Bath. We deliberately do not name clients, addresses or dates — the value is in the approach, the kit chosen, the survey, the staging, the certification. If your project shape matches one of these, the pattern travels.
Every install ends the same way: tested to BS 7671, NAPIT-certified, paperwork in your inbox, the board labelled and the customer shown how it all works. That's the shape of the job.

Survey, design and 3-day phased install. 8 access points, 24-port managed PoE, 27U cabinet, 96-port patch panel. Out-of-hours commissioning so the floor never stopped.
Read the case study →
12-property portfolio across Mid Somerset, rolling 14-day visit, per-circuit pricing, 8 satisfactory + 4 with C2 remediation. Smoke alarm upgrades in 2.
Read the case study →
4-bed terraced Bath property, conservation officer liaison, invisible cable routing, brass-finish accessory schedule, 9 working days, full RCBO board with AFDD bedroom + SPD.
Read the case study →
Six 22 kW 3-phase Type 2 chargers, dynamic load management, OZEV Workplace Charging Scheme grant, 4 working days, BS 7671 cert + Part P notified.
Read the case study →
Six classrooms, fire-alarm panel cut-over, BS 5266 emergency lighting refresh, staged across two half-terms. RCBO Type A throughout, BS 5839-1 + Part P + DBS site team.
Read the case study →
3-phase commercial kitchen, twin 32 A induction hobs, walk-in cold room, dimmable FOH lighting, 7 kW car-park EV charger. 8 working days, ready for reopening night.
Read the case study →
Somerset listed Georgian townhouse near the Royal Crescent. 12 LED downlights, concealed cove-strip uplight, 3 dimming zones, brass plate switches, no surface trunking, 6 working days.
Read the case study →
4-property care-home operator, 3-phase TP&N supplies, BS 7671 Amd 2 testing, BS 5839-1 fire-alarm and BS 5266 emergency-lighting cross-check, CQC-friendly compliance pack per site. From £800 per property.
Read the case study →
Single-storey extension, pendant-only to 12 LED dimmable downlights on 2 zones. Click Scolmore Deco Plus chrome plates, 6+ year LED lifespan, single-day install, ready for the agent's photographer the next morning.
Read the case study →
Two Hypervolt 7 kW chargers, two OZEV EVHS grants, separate MID sub-meters, Type A RCBO each, DNO-notified communal mains upgrade 60 A to 100 A. Five working days.
Read the case study →
Addressable Category L2 system in a Grade-II Listed coaching inn. Heritage-sensitive cable routes, FP200 throughout, FRS-ready handover, BS 5266 emergency-lighting cross-check. Six working days.
Read the case study →
4-bed converted stone barn, 100 A intake, 2 RCBO consumer units (main + annexe), 32 A heat-pump circuit Type A RCBO, EV-ready socket plumbed, garden lighting, no surface trunking on stone. Twelve working days.
Read the case study →Send the brief. Survey first, fixed quote, no surprises. Mid Somerset & Bath only.
07889 334849