Bathroom circuits in Shepton Mallet (BA4) — Section 701 zone planning, IP44+ everywhere, every circuit 30mA RCD-protected, electric showers, heated towel rails, IP-rated lighting, shaver sockets and extractors. Shepton Mallet bathroom electrician — Section 701 IP44+, RCD-protected, electric showers, heated towel rails. NAPIT-certified. From £120 + VAT @ 20%.
Or WhatsApp: wa.me/447889334849
NAPIT
CHAS
City & GuildsBathroom circuits in Shepton Mallet (BA4) — Section 701 zone planning, IP44+ everywhere, every circuit 30mA RCD-protected, electric showers, heated towel rails, IP-rated lighting, shaver sockets and extractors. Shepton Mallet bathroom electrician — Section 701 IP44+, RCD-protected, electric showers, heated towel rails. NAPIT-certified. From £120 + VAT @ 20%.
Full service detail and the eight-circuit kitchen brief on our parent Bathroom Electrics page.
Shepton Mallet is BA4 — market town centre with surrounding rural villages and the Royal Bath & West Showground catchment. Bathroom work splits between period properties in town and rural farmhouses where en-suites and family bathrooms get added to existing stock.
Rural farmhouses often have ancient consumer units — adding a bathroom shower circuit normally triggers a fuse board upgrade to satisfy 30mA RCD protection on every circuit.
Plenty of holiday-let stock around Pilton and Evercreech — bathrooms certified on 5-yearly EICR cycles. We issue full Minor Works / EIC.
Sister city pages: EICR in Shepton Mallet · Rewires in Shepton Mallet
Final price depends on access, cable routes, existing wiring and whether the room is being refurbed at the same time. Survey is free; written quote is fixed. Read the disclaimer below the cards before assuming.
Yes — Pilton, Evercreech, Croscombe, Doulting, Cranmore and surrounding villages. Rural bathroom additions often need a fuse board upgrade to give 30mA RCD on the new shower circuit. We quote both as one job.
Single-circuit jobs (extractor, towel rail, shaver, mirror) are 1 day. A shower circuit replace is normally 1 day. A full bathroom rewire (extractor, lighting, shaver, towel rail, shower) is 2-3 days for first-fix and 1 day for second-fix after the tiling is in.
Section 701 of BS 7671 is the special-locations chapter for rooms with baths and showers. It defines Zones 0, 1 and 2 around the bath/shower and dictates IP rating and what fittings are permitted in each zone. Zone 0 is inside the bath itself (12V SELV only). Zone 1 is above the rim (IP65, 30mA RCD). Zone 2 is the area within 0.6m of zone 1 (IP44 minimum). Outside zones is 'general' but RCD protection is still required on every circuit serving the bathroom.
Free survey, fixed-price written quote, full BS 7671 Section 701 certification. Call Dan directly on 07889 334849.
07889 334849