07889 334849☰Get a quote
Multifunction tester with test leads connected, showing a loop impedance result

Paperwork, explained

Which electrical certificate should you get?

Every piece of electrical work should leave you with paperwork, and the right document depends on the job. Here is what an EIC, a Minor Works certificate, an EICR and a Building Regulations compliance certificate are, and what to ask for when buying, selling or letting.

Accredited & insured
NAPIT approvedNAPIT
CHAS accreditedCHAS
City & Guilds qualifiedCity & Guilds
Part P registeredPart P
BS 7671 18th Edition compliantBS 7671

Last reviewed 25 October 2026. Covers homes in England. Certificates issued to BS 7671:2018+A4:2026.

The four documents

What each piece of paper is.

Electrical work in a home should leave you with paperwork. Which document depends on what was done. Descriptions below follow the free IET model forms for BS 7671:2018+A4:2026 and the Building Regulations.

New work

Electrical Installation Certificate (EIC)

For a new installation, any job that adds one or more new circuits, and every consumer unit replacement. It is signed for design, construction, and inspection and testing (one person can sign all three) and is only valid with its schedule of inspections and schedules of circuit details and test results attached. The original goes to whoever ordered the work.

Small jobs

Minor Electrical Installation Works Certificate (MEIWC)

For an addition or alteration that does not add a new circuit: an extra socket, a new light point on an existing circuit, moving a switch. One certificate per circuit worked on. It can also be used when accessories or light fittings are replaced.

Existing installation

Electrical Installation Condition Report (EICR)

A report on the condition of what is already there. The outcome is satisfactory or unsatisfactory: a C1 or C2 makes it unsatisfactory, while C3 and FI items are listed separately. It is never the paperwork for new work or repairs. More on EICRs.

Notifiable work

Building Regulations compliance certificate

Confirms that notifiable work has been self-certified through a competent person scheme. It is separate from the EIC or MEIWC, so for notifiable work you should get both. We are registered with NAPIT (66245), and NAPIT issues ours.

Job by job

What you should get.

A quick reference for homes in England. If you are unsure which applies to your job, ask before work starts: a good electrician will tell you which certificate you will receive.

JobElectrical paperworkNotifiable (England)?What you should end up with
Full or partial rewireElectrical Installation CertificateYes, new circuitsEIC + compliance certificate
Consumer unit (fuse board) replacementElectrical Installation CertificateYesEIC + compliance certificate
Any new circuit: EV charger, electric shower, cooker, garden room, outbuildingElectrical Installation CertificateYesEIC + compliance certificate
Extra socket or light on an existing circuit, away from a bath or showerMinor Works certificateNoMEIWC
Moving a socket or switch on an existing circuit, away from a bath or showerMinor Works certificateNoMEIWC
Adding or altering anything in the zone around a bath or showerMinor Works certificate, or EIC if there is a new circuitYes, special locationMEIWC or EIC + compliance certificate
Swapping a light fitting or accessory like for likeMinor Works certificate may be usedNoMEIWC
Remedial work after an EICREIC or Minor Works certificate, depending on the workOnly if the work itself is notifiableCertificate for the work; landlords send it to the tenant
Checking an existing installation: rental, sale, purchase, or just peace of mindElectrical Installation Condition ReportNoEICR

Notifiable means the three categories in regulation 12(6A) of the Building Regulations 2010: a new circuit, a consumer unit replacement, or an addition or alteration in a special location. A special location is the space around a bath or shower (defined in regulation 12(9): broadly up to 2.25 m above the floor and 0.6 m out from the edge of the bath or shower tray), or a room with a swimming pool or sauna heater. Sources: legislation.gov.uk, regulation 12; gov.uk, Approved Document P.

Part P

How notifiable work gets signed off.

There are three routes for notifiable electrical work in a home:

  • A registered competent person. An electrician on a government-authorised scheme, such as NAPIT, self-certifies the work. Within 30 days of completion the occupier must get a copy of the certificate and building control must be notified (regulation 20(3)). In practice the scheme does the notifying; NAPIT says your certificate should be posted to you within 30 days.
  • A third-party certifier, appointed before the work starts, inspects work done by someone who is not registered.
  • Building control, notified before work begins, which inspects and charges a fee.

We use the first route. Every notifiable job we do is notified through NAPIT under registration 66245, and you receive both the BS 7671 certificate from us and the compliance certificate from NAPIT. NAPIT also says its schemes require installers to warrant relevant work for at least 6 years.

Sources: legislation.gov.uk, regulation 20; NAPIT consumer advice for households. More on our registration: why NAPIT 66245 matters and accreditations.

Buying or selling

What to ask for.

Selling

  • Gather the EIC or Minor Works certificate for each job done while you owned the house.
  • For notifiable work (rewire, new consumer unit, new circuits, bathroom work), find the Building Regulations compliance certificate too.
  • Missing paperwork? Ask the electrician who did the work first.

Buying

  • Ask which electrical work has been done and for the certificates that go with it.
  • Check the consumer unit date against the paperwork: a newer board should come with an EIC and a compliance certificate.
  • A pre-purchase EICR tells you the condition today. See home-buyer electrical survey.

Letting

  • Landlords need an EICR at least every 5 years, with copies for tenants.
  • gov.uk accepts a satisfactory EICR, an EIC or a Minor Works certificate as written confirmation that remedial work is done.
  • What changed in 2026: Renters' Rights Act and your electrics.

An EICR records the condition of the installation on the day. It does not replace missing certificates for past work, and it does not confirm that past notifiable work was notified. Landlord source: gov.uk electrical safety standards guidance.

Before you pay

Four quick checks.

  1. Check the registration. Look the business up on the NAPIT register search (or the scheme they name) before work starts.
  2. Ask which certificate you will get and whether the job is notifiable.
  3. Look for the schedules. An EIC without its test results attached is not complete.
  4. Diary the compliance certificate. For notifiable work, it should arrive within about 30 days.

What the qualifications behind the paperwork mean: electrical qualifications explained. A room-by-room self-check: electrical safety checklist.

What we hand over

  • The right BS 7671:2018+A4:2026 certificate for the job, with every schedule and test result.
  • Notification through NAPIT for notifiable work, so the compliance certificate follows.
  • EICRs with each code explained in plain English, and a written quote for any remedial work.

Every job is priced individually: a fixed written quote after a survey. Common jobs: consumer units, rewires, EV chargers, bathroom electrics.

FAQ

Certificate questions.

Is an EICR the same as an electrical certificate?

No. An Electrical Installation Condition Report is a report on the condition of an existing installation. An Electrical Installation Certificate or a Minor Works certificate is issued for new work. An EICR is never the paperwork for a new consumer unit, a new circuit or remedial work.

Do I get a certificate for a small job like an extra socket?

Yes. An addition or alteration that does not add a new circuit, such as an extra socket or light on an existing circuit, should come with a Minor Electrical Installation Works Certificate. The IET model form notes say one can also be used when accessories or light fittings are replaced.

Which jobs are notifiable under Part P?

In a home in England: installing a new circuit, replacing a consumer unit, or any addition or alteration to existing circuits in a special location, meaning the zone around a bath or shower, or a room containing a swimming pool or sauna heater. That comes from regulation 12(6A) of the Building Regulations 2010.

When should my Building Regulations compliance certificate arrive?

The installer, or their scheme on their behalf, must give the occupier a copy and notify building control within 30 days of the work being completed. NAPIT says that if it has not arrived, wait a further week for the postal run and then contact NAPIT customer services.

Which edition of the wiring regulations are your certificates issued to?

BS 7671:2018+A4:2026, the current edition of the IET Wiring Regulations.

Is the compliance certificate the same as the electrical certificate?

No. For notifiable work you should get both: the BS 7671 certificate from the installer (an Electrical Installation Certificate or a Minor Works certificate), and the Building Regulations compliance certificate, which confirms the work has been notified and self-certified as meeting the Building Regulations.

Sources

Where this comes from.

  1. IET: BS 7671:2018+A4:2026 model forms (EIC, Minor Works certificate and EICR, dated 15 April 2026)
  2. legislation.gov.uk: Building Regulations 2010, regulation 12 (notifiable work, special locations)
  3. legislation.gov.uk: Building Regulations 2010, regulation 20 (self-certification, 30 days)
  4. gov.uk: Approved Document P, electrical safety in dwellings
  5. NAPIT: consumer advice for households
  6. gov.uk: Electrical safety standards in the private and social rented sectors, guidance

Last reviewed 25 October 2026. General information for homes in England, not legal advice.

Get a quote

Need the right paperwork?

Whether it is a new circuit, a consumer unit or an EICR for a sale or a let, tell us about the job and we'll confirm which certificate you will get before we start.

  • ✓ NAPIT registered (66245) & CHAS accredited
  • ✓ Fully insured, every job certified
  • ✓ Every job priced individually: fixed written quote after a survey
  • ✓ Mid Somerset, Bath & North East Somerset

Prefer to talk? Call DS Electrical Installations (SW) Ltd on 07889 334849 or email [email protected].

✓

Thanks, that’s sent.

DS Electrical Installations (SW) Ltd will call you back to talk through the job.