Heritage and Listed-building electrical installations — Georgian, Victorian and Edwardian stock, conservation areas and Listed Buildings. Conservation-officer-aware cable routing, minimal-intervention first-fix, period fittings, zero damage to original fabric. NAPIT-certified, BS 7671 18th edition, Part P notified. From £180 + VAT @ 20%.
Or WhatsApp: wa.me/447889334849
NAPIT
CHAS
City & GuildsHeritage electrical installation in Frome (BA11) — period-property rewires, Listed Building work, conservation-area properties and pre-1900 stock. Minimal-intervention cable routing through joist voids, behind original skirting and under floorboards, with surface clip-direct or period-style conduit on stone walls where chasing would damage fabric. Full conservation-officer liaison and LBC documentation. NAPIT-certified, BS 7671 18th edition, Part P notified. From £180 + VAT @ 20%.
Full service detail on our parent Heritage Installations page.
Frome (BA11) is the converted-mill town — a lot of stock is industrial-heritage conversion (warehouses, mills, old factories turned into flats, studios and creative workspace). We deal with three-phase incomers, exposed-brick cable runs and the kind of awkward conduit/tray jobs that come with industrial-conversion living.
Frome stock ranges from Georgian Catherine Hill terraces through Victorian artisans' cottages to converted Welshmill and Saxonvale industrial units.
Frome has a strong creative/maker economy — studios, workshops, small commercial premises behind shopfronts. Often three-phase, often shared distribution, often needing a smart approach to load and metering.
Sister city pages: EICR in Frome · Rewires in Frome
Final price depends on access, cable routes, existing wiring, scope and time on site. Survey is free; written quote is fixed. Read the disclaimer below the cards before assuming.
Yes — heritage electrical work is the bulk of what we do across Frome and the rest of east/central Somerset. Approach: minimal-intervention cable routes (under floorboards, in joist voids, behind existing skirting), surface clip-direct on stone walls where chases would damage fabric, period-style conduit where surface-fix has to look right, and full coordination with the conservation officer or architect before any first-fix. We document everything for the LBC application.
For Grade I, Grade II* and most Grade II Listed properties — usually yes for anything beyond like-for-like replacement. We help write the supporting note describing cable routes, fixings and reinstatement. The local authority conservation officer normally signs off straightforward rewires within a few weeks; complex jobs may need a heritage statement.
Yes. We work regularly with period-look ranges (brass, antique copper, Bakelite-style dolly switches) and specialist suppliers for one-offs. If you're matching an existing scheme — Soho Lighting, Dowsing & Reynolds, Forbes & Lomax — let us know at survey and we'll quote on the actual fittings.
Free survey, fixed-price written quote, full BS 7671 certification. Call Dan directly on 07889 334849.
07889 334849