BA4 · NAPIT Approved · BS 7671 18th Edition · Part P Notified

Kitchen Electrician
in Shepton Mallet

Kitchen circuits in Shepton Mallet (BA4) — cooker and induction hob radials, dedicated worktop ring main, LED downlights, under-cabinet lighting, Quooker spurs and BS 5839-6 heat detection. Shepton Mallet kitchen electrician — covering BA4 town, surrounding villages and the Royal Bath & West Showground. BS 7671 18th edition, NAPIT-certified. From £140 + VAT @ 20%.

Or WhatsApp: wa.me/447889334849
Kitchen electrical install in Shepton Mallet — DS Electrical
NAPIT approved electrical contractorNAPIT
CHAS accredited contractorCHAS
City and Guilds qualified electricianCity & Guilds
TrustMark government endorsedTrustMark
Part P registered electricianPart P
BS 7671 18th Edition compliantBS 7671

What's wired in a Shepton Mallet kitchen

Kitchen circuits in Shepton Mallet (BA4) — cooker and induction hob radials, dedicated worktop ring main, LED downlights, under-cabinet lighting, Quooker spurs and BS 5839-6 heat detection. Shepton Mallet kitchen electrician — covering BA4 town, surrounding villages and the Royal Bath & West Showground. BS 7671 18th edition, NAPIT-certified. From £140 + VAT @ 20%.

Full service detail and the eight-circuit kitchen brief on our parent Kitchen Electrics page.

Why kitchens in Shepton Mallet are different

Shepton Mallet is BA4 — old market town with a working industrial estate at Charlton Road, big agricultural and equine catchment around the Royal Bath & West Showground. Kitchen work splits between in-town period properties and rural farmhouses where mains supply is sometimes single-phase rural and circuits run long.

Rural BA4 properties often have older fuse boxes (still rewireable-fuse boards in some farmhouses) — kitchen upgrades typically trigger a CU upgrade at the same time to give RCD protection on every new circuit.

Plenty of holiday-let and short-let stock around Pilton, Evercreech and the Showground — kitchens get heavy seasonal use and need certs that satisfy landlord obligations.

Sister city pages: EICR in Shepton Mallet · Rewires in Shepton Mallet

Pricing ladder for Shepton Mallet

Final price depends on access, cable routes, existing wiring and whether the room is being refurbed at the same time. Survey is free; written quote is fixed. Read the disclaimer below the cards before assuming.

Quick

Boiling-water-tap circuit + isolator

from £140
+ VAT @ 20% · from
  • Dedicated 13A spur
  • Above-worktop isolator switch
  • Fused connection unit behind cabinet
  • Minor Works Certificate
Quick

Extractor fan circuit + isolator

from £140
+ VAT @ 20% · from
  • Mains-isolated cooker hood spur
  • Switched fused connection unit
  • Run-on timer where required
  • Minor Works Certificate
Standard

Under-cabinet LED + driver

from £220
+ VAT @ 20% · from
  • LED strip or bar under wall units
  • Driver in vented top cupboard
  • Worktop or sensor switching
  • Lamps / driver supplied
Standard

Cooker circuit (replace existing 32A)

from £220
+ VAT @ 20% · from
  • Like-for-like 32A radial replacement
  • 4mm or 6mm cable to suit cooker
  • 45A cooker control unit
  • Minor Works or EIC issued
Standard

Worktop sockets (4 new doubles)

from £280
+ VAT @ 20% · from
  • 4× double sockets, USB optional
  • Spurred from kitchen ring main
  • Min 300mm clear of sink edge
  • Minor Works Certificate
Standard

LED downlights (6 lights)

from £380
+ VAT @ 20% · from
  • 6× sealed dimmable LED downlights
  • Fire-rated hoods if separating ceiling
  • Drivers mounted accessibly
  • Lamps / fittings supplied

Common questions

Do you cover rural BA4 farmhouses around Shepton?

Yes — Pilton, Evercreech, Croscombe, Stoke St Michael, Doulting and out to Cranmore. Rural farmhouse kitchens often need a fuse board upgrade alongside the kitchen rewire to give 30mA RCD protection on the new circuits. We quote both jobs as one.

How long does a kitchen rewire take?

Single-circuit jobs (cooker, Quooker, fan) are 1 day. A worktop sockets and LED downlights pair is 1-2 days. Full kitchen refurb electrics (cooker, hob, ring main, lighting, fan) is 2-4 days for first-fix and 1-2 days for second-fix once the units are in. We work to your kitchen fitter's programme.

Do I need a fuse board upgrade for new kitchen circuits?

Often, yes. New circuits in a kitchen — dedicated cooker, induction hob, Quooker spur, additional ring main — all need 30mA RCD protection (typically a per-circuit RCBO). If your existing board is rewireable-fuse, split-load with shared RCDs, or has no spare ways, we'll quote a fuse board upgrade alongside. It's much cheaper to do both at once than retrofit later.

Ready for a quote in Shepton Mallet?

Free survey, fixed-price written quote, full BS 7671 certification. Call Dan directly on 07889 334849.

07889 334849
Email Us WhatsApp
Call Dan07889 334849 WhatsApp Email
Call Dan — 07889 334849